Planters and coordinated furniture defining a public streetscape edge

Roadside & municipal separation

Planting, separation and public-space order at the road edge.

Review road planter barriers, landscape planters and supporting furniture around pedestrian movement, cycle routes, traffic separation, visibility, drainage and maintenance.

Decision priorities

Road-edge applications require project-specific safety review.

Start with the questions that affect product fit, approval, production and long-term use.

01

Separation intent

Define whether the element guides pedestrians, separates cycles, protects amenity or organizes space.

02

Visibility & clearance

Review sightlines, setbacks, pedestrian clearance and emergency or service access.

03

Ground & drainage

Confirm surface, leveling, drainage, movement and the intended anchoring condition.

04

Maintenance

Plan planting, watering, cleaning, replacement and vehicle access.

A useful first brief

Road-edge project inputs to confirm.

GENAN supplies planter and barrier products to the approved project specification. The responsible designer and authority must confirm placement, safety, crash, loading, accessibility and regulatory requirements for the site.

  1. 01

    Road, pedestrian and cycle layout

  2. 02

    Purpose of separation and required performance

  3. 03

    Authority drawings and mandatory safety standards

  4. 04

    Sightline, clearance, drainage and fixing conditions

  5. 05

    Planting and maintenance strategy

  6. 06

    Quantities, module lengths and delivery sequence

Relevant product families

Catalogue references are a starting point, not a substitute for traffic engineering.

Use the closest catalogue references to establish the brief, then confirm project-specific details in writing.

Working route

Resolve function and authority requirements before production.

Each stage is confirmed against the selected reference, quantity and written project requirements.

  1. 01

    Define the function

    Clarify guidance, separation, planting, amenity and traffic context.

  2. 02

    Review authority inputs

    Record mandatory drawings, standards, clearances and site constraints.

  3. 03

    Develop the product schedule

    Confirm modules, finishes, planting, fixing and maintenance access.

  4. 04

    Supply to approval

    Manufacture and pack against the final approved written scope.

Important: GENAN road planter barriers are streetscape products. They must not be represented as crash-tested vehicle restraints unless a specific product has documented, applicable test evidence.

Direct GENAN manufacturing

Reviewing a roadside or municipal separation package?

Upload the authority drawing and required function so we can identify the closest product references and open questions.

Send the first brief
WhatsApp+86 136 2579 9499