
OEM & private label
Your market knowledge, supported by direct manufacturing.
Develop a focused private-label range or adapt selected references through a controlled review of design, tooling, branding, quantity, packaging and repeat-production needs.
Decision priorities
What an OEM programme must define.
Start with the questions that affect product fit, approval, production and long-term use.
Product ownership
Clarify whether the brief uses an existing reference, a modified platform or a buyer-supplied design.
Engineering scope
Identify structural, dimensional, material, tooling and approval responsibilities.
Brand application
Review logo, label, color, packaging and documentation requirements before sampling.
Repeatability
Define forecast quantities, quality checkpoints and change control for repeat production.
A useful first brief
Include these points in an OEM enquiry.
GENAN reviews feasibility before making commitments. Intellectual-property ownership, confidentiality, tooling, exclusivity and production rights apply only as recorded in the final written agreement.
- 01
Target market and sales channel
- 02
Existing reference or buyer-supplied concept
- 03
Expected modifications and brand application
- 04
Estimated annual and initial quantities
- 05
Sample, tooling and approval expectations
- 06
Packaging, documentation and launch timing
Relevant product families
A controlled development process protects both sides.
Use the closest catalogue references to establish the brief, then confirm project-specific details in writing.
Park Benches
Timber, metal and mixed-material benches.
↗Modular Seating
Flexible systems for social public spaces.
↗Traditional Benches
Familiar forms with durable public-space construction.
↗Integrated Planter Seating
Greenery and seating in one coordinated element.
↗Landscape Planters
Freestanding planters for streets and plazas.
↗Waste & Recycling
Durable collection points for public use.
↗Working route
From concept boundary to repeatable production.
Each stage is confirmed against the selected reference, quantity and written project requirements.
- 01
Commercial & IP brief
Define the market, ownership, confidentiality and intended cooperation model.
- 02
Design feasibility
Review structure, materials, tooling, quantity and production constraints.
- 03
Prototype & approval
Confirm the approved sample, documentation, branding and quality checkpoints.
- 04
Repeat production
Manufacture against controlled information and agreed change management.
Important: A website enquiry starts a feasibility discussion only. No exclusivity, ownership transfer, certification or production commitment exists until confirmed in a signed agreement.
Direct GENAN manufacturing
Exploring an OEM or private-label range?
Share the market, concept boundary, expected quantity and launch timing for a confidential first review.
Send the first brief