Public-space furniture arranged in a bright landscaped setting

For contractors & installers

Project supply that respects the site programme.

Coordinate selected products, fixing intent, finish, packing and delivery information with the manufacturing team before the site needs answers.

Decision priorities

Information that keeps procurement and installation moving.

Start with the questions that affect product fit, approval, production and long-term use.

01

Specification alignment

Match the reference to drawings, schedules, finishes and buyer-supplied requirements.

02

Fixing review

Confirm the intended substrate, fixing approach and installation information before approval.

03

Programme visibility

Review quantity, approval dates, production timing, packing and delivery sequence.

04

Site-ready coordination

Identify labeling, replacement parts and package separation needs before dispatch.

A useful first brief

Include these points in a contractor enquiry.

GENAN reviews available catalogue references against the submitted project brief. Exact structure, fixing details, packing and performance requirements are confirmed in the quotation and approved production information.

  1. 01

    Project country, site and package scope

  2. 02

    Product references and bill of quantities

  3. 03

    Required finish, fixing and installation conditions

  4. 04

    Submittal or approval deadline

  5. 05

    Target delivery window and delivery sequence

  6. 06

    Drawings, specifications or tender schedules

Relevant product families

Resolve technical questions before they become site delays.

Use the closest catalogue references to establish the brief, then confirm project-specific details in writing.

Working route

From tender reference to approved supply package.

Each stage is confirmed against the selected reference, quantity and written project requirements.

  1. 01

    Scope review

    Check drawings, quantities, selected references and delivery constraints.

  2. 02

    Technical clarification

    Resolve material, finish, dimensions, fixing and documentation needs.

  3. 03

    Approval

    Confirm samples or production information against the agreed project scope.

  4. 04

    Manufacture & dispatch

    Produce, inspect, label, pack and prepare the agreed export documents.

Direct GENAN manufacturing

Pricing a live project package?

Upload the schedule or drawing and tell us the quantity, approval deadline and target delivery window.

Send the first brief
WhatsApp+86 136 2579 9499